Monday, March 15, 2021

so, the place is almost as clean as it was when i brought those shelves in last week. almost.

the 16-bit pc has been placed in the space on a bookend table, beside one of the speakers. the kvm is sitting on top of it, and i'll need to connect it the next time i turn it on. it's a shame it takes power, but whatever.

i've moved the 32-bit pc back where it was, which is close to but not in it's resting spot. i need to rebuild it, first - and i'm currently rebuilding it temporarily.

one of the two bookshelves had a back, but the nails were mostly missing. i ran around the back with some finishing nails. while you can see crumbly particleboard if you look, it's almost as good as new - i just need to screw the wobbly top piece back in place by rescrewing it beside the old broken screw. so, yeah - you'll be able to tell if you look at it. but, who cares? it's been scrubbed down, and it's otherwise ready to put some books and cds on it....as soon as it gets some shelves.

i finally took apart that old chest thing that i had converted into a headboard, and has since just flat out broken. by my account, i should get roughly 6 shelves out of it,  and could potentially get a few other things out of it. these walls are full of pre-existing holes. it'll make it easy to screw a couple of pieces of wood in as loose shelves, and i might need it.

the table is in kitchener, apparently. that's about a three hour drive. so, i'll need to set the two tables up when it gets here, and then have space to set things back up on that side of the apartment, as well.

for now, i'm going to eat....

and, then we're back to this, hopefully quickly - the last update was actually not february but back on january 30th:
https://drive.google.com/file/d/1vdvEPJ8NtNUbuPItFour9gJdFa4Yy0gE/view?usp=sharing